Solar for Factories in Faisalabad

On-grid or hybrid solar systems for factories, from small workshops to sites over 1 MW. We size each one from your load, your shift hours and your budget.

One factory owner's first year

Rs 2,000,000+

saved on electricity in the first year, Khurrianwala

14 kW on-grid6 kW hybridBackup in load shedding
The setup has reduced our electricity costs and ensured backup during power outages. I'm really satisfied with their work! Mian Shahid, factory owner, Khurrianwala
Up to 1 MW+
from small workshops to large sheds
While you run
panels and wiring go in during working hours
Written estimate
the units your system should make each month
FESCO paperwork
net billing application prepared and submitted
Two FESCO net meters and a distribution box on a wall

Sized for the units your machines use in daylight

Solar produces during the day, when a B2 unit costs Rs 22.83. A spare unit sold back earns Rs 8.13. So we size the system to the load you run in daylight, and add batteries only where the evening peak or load shedding costs you more.

B2 industrial tariffFeb to Dec 2026
Daytime unit you buyRs 22.83
Evening unit you buyRs 35.68
Unit you sell to FESCORs 8.13

A unit you use is worth 2.8× a unit you sell.

Energy charge only, before tax and fixed charges. NEPRA decision of February 2026.

Three ways to set up solar in a factory

Which one suits you depends on your load, your shift hours and, most of all, your budget.

PanelsHybrid inverterMachines BatteryFESCO grid

If the budget allows

Hybrid with batteries

For factories with a peak load around 30 kW and room in the budget.

In load shedding
Keeps running on batteries
Power to FESCO
Only if you choose net billing
Cost
Highest
PanelsOn-grid inverterMachines Zero-export device:nothing goes back FESCO grid

The cheapest

On-grid with zero export

For day-shift factories that want a lower bill, not a zero bill.

In load shedding
Stops. There is no backup
Power to FESCO
None
Cost
Lowest
On-gridMost machines Hybrid + batteryKey machines

In between

On-grid plus a small hybrid

For machines that must keep running, on a tighter budget.

In load shedding
The hybrid side keeps running
Power to FESCO
Only if you choose net billing
Cost
In between

Not sure which one? Send the bill and your shift hours.

Ask on WhatsApp

Two factories near Faisalabad

One system we built, and one we brought back to full output.

Our install · Khurrianwala

Rs 2,000,000+saved in the first year

On-grid for the machines, hybrid for the outages

Grid on
Load shedding
  • Feeding the hybrid inverter
  • Feeding the on-grid inverter
  • Off while the grid is down

A 14 kW on-grid system runs the machines, and a separate hybrid system keeps the essentials on. Six panels always feed the hybrid inverter. When load shedding starts, six more switch over from the on-grid side, so the hybrid system gets more solar power during the outage.

The setup has reduced our electricity costs and ensured backup during power outages. I'm really satisfied with their work!Mian Shahid, factory owner, Khurrianwala

Service job · Jaranwala Road

Rs 150,000recovered each month, approximately

A 200 kW textile factory back to full output

Output before we came83%
After cleaning and an inverter check100%

Output as a share of what the system gave when clean. Dust had cut it by 17% in six months.

We didn't install this one. The owner called us after the output fell, and a deep clean with an inverter inspection brought it back to full capacity.

Panel cleaning for factories →

From your bill to a running system

Four steps. The factory keeps working through all of them except a short planned switch-over at the end.

Installers fitting rows of solar panels on an industrial rooftop
  1. Send your bill and load details

    WhatsApp a photo of your last bill. Tell us your sanctioned load, your shift hours and which machines must keep running.

  2. Site survey and shed check

    We check the roof or steel shed that will carry the panels, and add supports where it needs them.

  3. Quote with a generation estimate

    The written quote shows the units the system should produce each month, so you can check the saving against your bills.

  4. Installed while you keep running

    Panels and wiring go in during working hours. Only the final switch-over needs a short planned shutdown, and we agree the time with you.

What after-sales covers

Support is free. Repairs depend on the product warranty and on what caused the fault. Routine work is paid.

A worker cleaning solar panels with a long-handled mop

Free support

  • Inspection and troubleshooting of the installed system
  • Technical help with system performance and operation
  • Guidance on proper system usage and maintenance
  • Coordinating warranty support for equipment covered by the manufacturer's warranty, where it applies

What factory owners ask us

More questions and answers →
Will installation stop production?

No. Panels and wiring go in while the factory runs. The final switch-over needs a short planned shutdown, and we agree the time with you.

On-grid or hybrid: which is right for my factory?

It depends on your load, your shifts and your budget. If the budget allows and your peak load is around 30 kW, we recommend hybrid, which keeps machines running through load shedding. If you run in the daytime and want a smaller bill rather than a zero bill, on-grid with a zero-export device is the cheapest option, but it gives no backup.

What does a zero-export device do?

It stops the system sending power back to FESCO, so the solar only runs your own machines. An exported unit earns Rs 8.13 under net billing. An off-peak unit you stop buying saves Rs 22.83 before tax on a B2 connection, so the value is in the units you use.

Can our shed carry the panels?

We check the roof or shed structure before we quote. Where it needs strengthening, we add supports and include them in the quote.

How big a system can you install?

From small workshops to systems over 1 MW. We start from your sanctioned load and the load you run in daylight.

Do you handle the FESCO net billing application?

Yes. If you want to export and sell units under net billing, we prepare and submit the application for you.

Still have a question? Ask it on WhatsApp →

Send us your factory's electricity bill

We will reply with the system size, the setup we would suggest and a price range.

Helpful to send with it

  • A photo of your last bill
  • Your sanctioned load
  • Your shift hours
  • The machines that must keep running